Grand Hotel Monterrey, Lloret de Mar, Spain
project profile data | |
---|---|
Area: | 23,300 sq. ft. (2,160 m²) |
Construction Year: | 2008 |
Architect/Design: | Carlos Subirà, Lloret de Mar |
Contractor: | Vallimper S.A., Terrassa and Jardinatura S.L., Terrassa |
System Build-up: | with Stabilodrain® SD 30 |
Due to topographical reasons the hotel access was only possible crossing the top of a two story deep underground garage. This was a technical challenge for the engineers of the ZinCo technical department but also for the contractors Vallimper and Jardinatura. A sufficiently dimensioned base layer had to be created for the heavy load traffic whilst integrating the green areas with the high palm trees. The palm species “Howea forsteriana” grows up to 50 ft. (15 m) in height. The remaining green roof area consists of lawn which is irrigated by an automatic system.